CEOS Mission:



Agency: NASA
Mission Status:Mission complete
Orbit:Sun-synchronous
Altitude (km):1101  
LST:N/A
Orbit Sense:N/A
Orbit Period (Min.):107.4
Orbit Inclination (Deg.):99.9
Repeat Cycle (Days):N/A
Longitude (Deg.):N/A
Mission Launched:1975-06-12
End of Life:1983-03-29

Instrument List:

LRIR
 
 
 
 
 
 

(select instrument name to view details)



CEOS Systems Engineering Office (SEO)

CEOS Data Base Version: 17 - Created: 2012-01-18