CEOS Mission: FY-1C Polar-orbiting Meteorological Satellite
| Agency: | NRSCC (primary) |
| Agency: | NSMC-CMA |
| Mission Status: | Mission complete |
| Orbit: | Sun-synchronous |
| Altitude (km): | 863   |
| LST: | 8:50 |
| Orbit Sense: | Descending |
| Orbit Period (Min.): | 102.3 |
| Orbit Inclination (Deg.): | 98.85 |
| Repeat Cycle (Days): | 10.61 |
| Longitude (Deg.): | N/A |
| Mission Launched: | 1999-05-10 |
| End of Life: | 2001-05-10 |
Instrument List:
| MVISR (10 channels) |
|   |
|   |
|   |
|   |
|   |
|   |
(select instrument name to view details)
CEOS Systems Engineering Office (SEO)
CEOS Data Base Version: 17 - Created: 2012-01-18